LUXERIOUS
LUXERIOUS - ₹2400 / SFT.
Design & Drawing
2D floor Plan
3D Elevations
Civil construction
Basement height – 4 feet
Floor to floor height – 10 feet
Steel: ARS/ISTEEL
Cement (Grade 53) – Coromandel/Ultratech/Ramco
Concrete – M20 grade
Solid Block walls – 6” & 4” thickness
Bricks: 9 inch for Exterior wall, 4.5 Inch for Interior Wall
Msand – Blockwork & R sand: Plastering
Electrical
Wires: Kundan FRLS /Finolex
Switches: Legrand / Kundan
Plumbing & Fixtures
Bathroom – 1 EWC, 1 Wash Basin with tap, 1 shower with 2-in1 wall
mixer for hot & cold water and health faucet.
Dining – 1 wash basin with tap
Kitchen – Single stainless steel sink with 1 tap., RO Point
Service – 1 tap point & water outlet point for washing machine
CPVC/PVC: Finolex
Door & Windows
Maindoor : Width-3.5’x Height 7’
Rooms: Width-3.0’x Height 7’
Toilet: Width-2.5’x Height 7’
Windows: Width-4’x Height 4’ (1 Window per room)
Main Door: Teak Wood Frame of 5 Inch by 3 Inch, Teak wood Door
Internal Door: Teak Wood Frame of 4 Inch by 3 Inch with Laminated Flush Door
Windows: UPVC3 Track sliding window – White
Floor & Wall Tiling
Floor : Tiles Upto ₹75 Per Sq ft
Toilet wall tile : Tiles Upto ₹55 Per Sq ft
Staircase Flooring: Granite Upto ₹80 Per Sq ft
Parking Tiles: Anti-skid Tiles Upto ₹55 Per Sq ft
Painting
Interior:
2 coat of Asian/Birla putty
1 coat of primer, 2 coats of Asian premium emulsion paint for the walls (light colours)
1 coat of primer and 2 coats of Asian premium emulsion paint for the ceiling.
Exterior:
1 coat of white cem
1 coat of Asian primer
2 coats of Asian apex paint
Inclusive
- Overhead Sintex tank – 2000 Litre
- Rainwater Harvesting
- SS Handrailing
- 2 Nos. Safety gate
- Soil testing
- Structural designing
- 3D elevation designing
Additional Charges
- Roof weathering
- Compound Wall
- Underground water storage Concrete Sump Rs 25 Per Litre
- Overhead concrete tank Rs 25 per litre
- Light fixtures & Fans
- Lift
- EB Connections & Charges
- Govt. approval charges
- Water & Sewarage Connection Charges
- Elevation Work Extra
- Water recycling tank based on the requirement
- Additional foundation height
- Outer area development (setback)